GE Vernova Hitachi Nuclear Energy (GVH, formerly GE Hitachi Nuclear Energy) is the Wilmington, North Carolina-based nuclear alliance formed by GE (60%, now GE Vernova) and Hitachi (40%) in 2007, combining reactor design, services for the global boiling-water-reactor fleet, and fuel manufacturing through Global Nuclear Fuel. Its flagship BWRX-300 small modular reactor — a 300 MWe natural-circulation design derived from the NRC-certified ESBWR — is the first grid-scale SMR under construction in the Western world, with Ontario Power Generation building the first of four units at Darlington for service by the end of 2030. In the US, TVA's Clinch River construction permit application cleared its NRC staff safety evaluation in June 2026, backed by a $400M DOE award, and in March 2026 the US and Japanese governments announced up to $40B to deploy up to 10 BWRX-300s (3 GW) in Tennessee and Alabama under the US–Japan strategic investment framework. The order book extends across Poland (ORLEN Synthos Green Energy), Sweden (down-selected by Vattenfall), the UK (Generic Design Assessment completed December 2025), Estonia, Hungary and Saskatchewan. GVH also co-developed the Natrium sodium-cooled fast reactor with TerraPower, which began construction in Wyoming in 2026. Jason Cooper became President & CEO in January 2026.

Main Products

BWRX-300

BWRX-300

In Development

300 MWe Gen III+ boiling-water small modular reactor derived from the NRC-certified ESBWR, using natural circulation and passive safety systems, a 60-year design life, and proven GNF fuel. Designed for a power block that fits within two soccer fields and 24–36 month nth-of-a-kind construction. The first grid-scale SMR under construction in the Western world.

Unit 1 under construction at OPG's Darlington site (construction began May 2025; in service by end of 2030, four units planned); TVA Clinch River construction permit in final NRC review with the mandatory hearing set for August 13, 2026; up to 10 further US units planned under the $40B US–Japan program; selected or down-selected in Poland, Sweden, Estonia, Hungary and Saskatchewan; UK Generic Design Assessment completed December 2025.

Output300 MWe
Design life60 years
Construction time (nth-of-a-kind)~24–36 months, first concrete to fuel-load ready
First-unit cost (Darlington)CAD $7.7B (~US $5.6B)

GE Vernova-led fuel alliance with Hitachi producing advanced BWR fuel assemblies (GNF2, GNF3, GNF4) that improve plant performance and fuel-cycle economics for the operating reactor fleet worldwide.

Manufacturing at Wilmington, North Carolina (operational since 1969) and Kurihama, Japan (since 1970); GNF fuel is also the fuel basis for the BWRX-300.

Fuel product linesGNF2, GNF3, GNF4
Manufacturing sitesWilmington, NC & Kurihama, Japan

Lifecycle services for the global BWR fleet (and PWR services) — outage execution, performance upgrades, inspections, non-destructive examination and VR-based training — built on GE's boiling-water-reactor lineage dating to the first privately financed reactor at Vallecitos in 1957 and the NRC-certified ABWR/ESBWR designs.

Run as GVH's Installed Base business; services span more than six decades of industry experience across the worldwide fleet.

Experience60+ years of BWR technology leadership

345 MWe sodium-cooled fast reactor with molten-salt thermal storage that can boost output to 500 MWe for over five hours, co-developed with TerraPower under a 2020 joint development agreement. The first plant is being built at Kemmerer, Wyoming.

NRC construction permit granted March 4, 2026; TerraPower and Bechtel began nuclear plant construction at Kemmerer Unit 1 in April 2026 with a workforce of roughly 1,600.

Output345 MWe (up to 500 MWe with storage boost)

What's Next

NRC decision on Clinch River construction permit

The NRC's mandatory uncontested hearing on TVA's construction permit for the first US BWRX-300 is set for August 13, 2026 (record open until August 27), after NRC staff recommended issuance in their June 2026 safety evaluation. A permit would clear TVA to start physical construction at Oak Ridge.

Q3 2026

Darlington Unit 1 completion and grid connection

OPG targets construction completion of the first BWRX-300 in late 2029 and commercial operation by the end of 2030 — which would make it the Western world's first operating grid-scale SMR. OPG applied for the 20-year operating licence in March 2026; shaft excavation was completed in early 2026 and tunnel-boring assembly is underway.

2030

First US BWRX-300 online at Clinch River

TVA targets commercial operation of the first US BWRX-300 at its Clinch River site in the early 2030s, supported by a $400M DOE Gen III+ award — positioned as the nation's first commercial SMR and the anchor of the $40B US–Japan Tennessee/Alabama deployment program.

Early 2030s

First Polish BWRX-300 units online at Włocławek

ORLEN and Synthos Green Energy's 50/50 JV (OSGE) selected Włocławek as the site of Poland's first SMR plant — planned as Europe's first BWRX-300 — with the ORLEN Group roadmap targeting at least two units (0.6 GW) commissioned by 2035.

2035

Operations & Revenue

StatusOperational — scaling SMR deployment

Revenue-generating nuclear fuel (Global Nuclear Fuel) and BWR fleet-services business, with the flagship BWRX-300 program in execution: first unit under construction at Darlington (in service by end of 2030), first US construction permit in final NRC review at TVA's Clinch River, and a multi-country order pipeline across Europe and North America.

Revenue Streams

Nuclear fuel (Global Nuclear Fuel)

GNF, a GE Vernova-led alliance with Hitachi, manufactures GNF2/GNF3/GNF4 fuel assemblies for the global BWR fleet at plants in Wilmington, North Carolina (since 1969) and Kurihama, Japan (since 1970).

Installed-base services

Outage services, plant upgrades, inspections, non-destructive examination and PWR services for the worldwide reactor fleet, drawing on more than six decades of BWR experience; run as a dedicated Installed Base business under CEO Craig Ranson.

BWRX-300 new-plant sales & technology licensing

Reactor technology contracts and licensing for BWRX-300 deployments — including OPG's four-unit Darlington project and a standard-design licensing agreement giving Poland's ORLEN Synthos Green Energy full access to the BWRX-300 technology.

Advanced reactor co-development (Natrium)

Co-developer with TerraPower of the Natrium 345 MWe sodium-cooled fast reactor with molten-salt energy storage, which received its NRC construction permit in March 2026 and began plant construction at Kemmerer, Wyoming in April 2026.

Key Metrics

Employees

~3,000

Est. Annual Revenue

~$2B annually (est.; JV financials not separately disclosed by GE Vernova or Hitachi)

BWRX-300 output

300 MWe (~300,000 homes)

BWRX-300 under construction

1 unit (Darlington; 4 planned on site, 1.2 GW)

Darlington 4-unit project cost

CAD $20.9B (CAD $7.7B for Unit 1)

US–Japan deployment program

Up to $40B / up to 10 units (3 GW) in Tennessee & Alabama

Nuclear heritage

60+ years (GE built the first privately funded reactor, 1957)

International BWRX-300 pipeline

Poland (~24 units planned), Sweden, Estonia, Hungary (LOI, up to 10), Saskatchewan

Timeline

2026Jason Cooper named President & CEO

Jason Cooper, who joined GVH in June 2025 as Advanced Nuclear CEO after leading GE Vernova's $7B heavy-duty gas turbine business, is appointed President & CEO of GE Vernova Hitachi Nuclear Energy in January 2026.

2026US–Japan $40B BWRX-300 program announced

At a March 2026 White House meeting between President Trump and Prime Minister Takaichi, the US and Japan announce up to $40B under their strategic investment framework to deploy up to 10 BWRX-300s (3 GW) in Tennessee and Alabama; the same month OPG applies for the Darlington operating licence and TerraPower's GVH-co-developed Natrium receives its NRC construction permit.

2026NRC staff recommend Clinch River construction permit

In June 2026, NRC staff publish a safety evaluation recommending issuance of the construction permit for TVA's Clinch River BWRX-300 — the final mandatory hearing is set for August 13, 2026, ahead of the original December timeline.

2025Darlington construction begins — first Western SMR

The CNSC grants OPG a licence to construct in April 2025, OPG takes its final investment decision (CAD $7.7B for Unit 1, CAD $20.9B for all four units), and construction of the first BWRX-300 begins in May 2025 — the first grid-scale SMR construction in the Western world.

2025TVA files first US BWRX-300 construction permit application

TVA submits the first US construction permit application for a BWRX-300 at the Clinch River site in Oak Ridge, Tennessee in May 2025; the NRC dockets it in July 2025.

2025Vattenfall down-selects BWRX-300 in Sweden

Vattenfall names the BWRX-300 one of two finalists (alongside the Rolls-Royce SMR) for ~1.5 GW of new nuclear capacity adjacent to its Ringhals plant on Sweden's Värö Peninsula.

2025UK GDA completed; DOE awards TVA $400M

In December 2025 the BWRX-300 completes the UK Generic Design Assessment — regulators find no fundamental safety, security or environmental shortfalls — and the US DOE awards TVA $400M under its Gen III+ SMR program to accelerate the Clinch River BWRX-300.

2024GE Vernova spin-off

GE completes the spin-off of its energy businesses into GE Vernova (NYSE: GEV) on April 2, 2024; GE's 60% stake in the nuclear JV transfers to GE Vernova, and the alliance entities are subsequently renamed under the GE Vernova Hitachi banner in 2025.

2023First North American grid-scale SMR contract

GEH, Ontario Power Generation, SNC-Lavalin (AtkinsRéalis) and Aecon sign the contract to deploy a BWRX-300 at Darlington — the first commercial contract for a grid-scale SMR in North America.

2021OPG selects BWRX-300 for Darlington

Ontario Power Generation selects the BWRX-300 for its Darlington New Nuclear Project — the first utility selection of the design and the anchor order for the program.

2020BWRX-300 licensing begins; Natrium partnership

GEH begins US licensing of the BWRX-300 small modular reactor and partners with TerraPower to jointly develop the Natrium sodium-cooled fast reactor.

2014ESBWR design certified

The Economic Simplified Boiling Water Reactor (ESBWR), the Gen III+ design the BWRX-300 is derived from, receives US NRC design certification.

2007GE-Hitachi nuclear alliance formed

GE and Hitachi combine their nuclear businesses into a global alliance — GE holding 60% and Hitachi 40% of the US-based venture — headquartered in Wilmington, North Carolina.

Funding

RoundDateAmountInvestorsSource
Joint venture formation2007-0660/40 equity allianceGeneral Electric (60%), Hitachi (40%)
Parent spin-off (GE stake to GE Vernova)2024-04-02N/A (ownership transfer)GE Vernova (NYSE: GEV) assumes GE's 60% stake
DOE Gen III+ SMR cost-share (via TVA, for Clinch River BWRX-300)2025-12$400MU.S. Department of Energy
US–Japan Strategic Investment (BWRX-300 deployment program)2026-03Up to $40BUS–Japan strategic investment framework (part of the $550B Japan–US trade deal); Japanese government-backed financing